The required strengthening of the building frame production-warehouse premises in Khotkovo, Moscow region
Abstract
The results of the survey of the frame of the building of the production and warehouse complex in the city of Khotkovo, Moscow region, mounted from the columns of a constant I-beam welded profile and continuous trusses covering, 24 m span structure, made with parallel belts and a triangular grid with a descending bearing diagonal made by the “Ruukki Rus” company of paired galvanized cold-formed profiles, interconnected and with profiles on bolts. The reasons for the loss of bearing capacity of some elements of the coating structures after installation, in the absence of drains and vertical connections between the farms at the highest snow load, including in the end of the building in March 2018 are analyzed. Additional measures to strengthen the structures to ensure its stability and bring the building into the working condition are described.
About the Authors
M. FarfelRussian Federation
M. Gukova
Russian Federation
D. Kondrashov
Russian Federation
D. Konyashin
Russian Federation
References
1. Серия 1.460.3-14. Стальные конструкции покрытий производственных зданий пролетами 18, 24 и 30 м с применением замкнутых гнутосварных профилей прямоугольного сечения типа «Молодечно». Чертежи КМ. 01.06.1982 г;
2. Металлические конструкции. В томах. Том 1. Общая часть. (Справочник проектировщика) / Под общ. ред. В.В. Кузнецова (ЦНИИпроектстальконструкция им. Н.П. Мельникова). -М: АСВ, 1998.
Review
For citations:
Farfel M., Gukova M., Kondrashov D., Konyashin D. The required strengthening of the building frame production-warehouse premises in Khotkovo, Moscow region. Bulletin of Science and Research Center of Construction. 2019;22(3):112-120. (In Russ.)